1 / 29

Used 2023 BMW M3 Competition

  • VIN #:

    WBS33AY06PFP75904

  • Stock #:

    MP1586

  • Mileage:

    13,349

  • Retail Price$77,995


  • Doc Fee

    +$225.00

    Dealer Price

    $78,220

Used 2023 BMW M3 Competition

  • VIN #:

    WBS33AY06PFP75904

  • Stock #:

    MP1586

  • Mileage:

    13,349

Description

This 2023 BMW M3 Competition delivers exhilarating performance with a 3.0L turbocharged inline-6 engine producing 503 horsepower paired with an 8-speed automatic transmission. Finished in striking Isle of Man Green Metallic, this executive sedan combines track-ready capability with refined luxury appointments and cutting-edge technology.Key Features:- Icon Adaptive LED Headlights with Laserlight- M Compound Brakes with Red Calipers- 19"x9.5" Front and 20"x10.5" Rear M Bi-color Wheels- Front Ventilated and Heated Seats with M Sport configuration- Power Front Seats with Lumbar Support- Parking Assistance Package with Rear Camera- Apple CarPlay & Android Auto Compatibility- Connected Package Pro with Navigation System- Wireless Device Charging- Harman/Kardon Surround Sound System with SiriusXMThis M3 Competition showcases meticulous maintenance with carefully controlled mileage at just over 13,000 miles. The premium Merino leather interior, adaptive suspension system, and comprehensive safety suite including dual front airbags, side airbags, and knee airbags reflect BMW's commitment to driver engagement and passenger security. Electronic Stability Control, traction control, and four-wheel independent adaptive suspension ensure composed handling in all conditions.Experience the perfect balance of raw performance and sophisticated comfort. Schedule your test drive today to feel the M3 Competition's dynamic capabilities firsthand.

Vehicle Details

Drive Train

Drive TrainRear Wheel Drive

Body

BodySedan

Doors

Doors4

City MPG

City MPG16

Hwy MPG

Hwy MPG23

Transmission

Transmission8-Speed Automatic Steptronic

Interior Color

Interior ColorTartufo

Exterior Color

Exterior ColorIsle of Man Green Metallic

Engine

Engine

3L I-6 Direct Injection
DOHC
Double VANOS Variable Valve Control
TwinPower Twin Turbo
Premium Gasoline
Engine With 503HP

Key Features

navigationapple carplayandroid autobluetoothbackup camerakeyless entryblind spot monitorhotspotlane departure warningcollision warningparking sensoradaptive headlightsforward collision warningstability controlimmobilizerrear air conditioningautomatic climate controlm sportinterior accentsleather seats

Detailed Specifications

  • CONVENIENCE

    • 12V power outlets 3 12V power outlets
    • Accessory power Retained accessory power
    • All-in-one key All-in-one remote fob and ignition key
    • Ambient lighting
    • Auto door locks Auto-locking doors
    • Auto-dimming door mirror driver Auto-dimming driver side mirror
    • Auto-dimming door mirror passenger Auto-dimming passenger side mirror
    • Battery charge warning
    • Beverage holders Front beverage holders
    • Beverage holders rear Rear beverage holders
    • Brake pad warning Brake pad wear indicator
    • Built-in virtual assistant BMW Intelligent Personal Assistant built-in virtual assistant
    • Bulb warning Bulb failure warning
    • Cargo access Proximity cargo area access release
    • Clock Digital clock
    • Compass
    • Concealed rear cargo storage Rear cargo area concealed storage
    • Cruise control Dynamic Cruise Control cruise control with steering wheel mounted controls
    • Day/Night rearview mirror
    • Door ajar warning Rear cargo area ajar warning
    • Door bins front Driver and passenger door bins
    • Door bins rear Rear door bins
    • Door locks Power door locks with 2 stage unlocking
    • Door mirror with tilt-down in reverse Power passenger door mirror with tilt down in reverse
    • Driver foot rest
    • Driver information center
    • Engine temperature warning
    • Engine/electric motor temperature gauge
    • First-row windows Power first-row windows
    • Floor console Full floor console
    • Floor console storage Covered floor console storage
    • Folding door mirrors Power folding door mirrors
    • Front reading lights
    • Fuel door lock Power fuel door lock
    • Full gauge cluster screen
    • Garage door opener
    • Glove box Illuminated glove box
    • Headlights on reminder
    • Heated door mirrors Heated driver and passenger side door mirrors
    • Ignition type Push-button
    • Illuminated glove box
    • Interior lock disable
    • Key in vehicle warning
    • Keyfob cargo controls Keyfob trunk control
    • Keyfob keyless entry
    • Keyfob window controls Keyfob window control
    • Low level warnings Low level warning for oil, coolant, fuel, washer fluid and brake fluid
    • Memory settings Memory settings include: door mirrors
    • Number of beverage holders 8 beverage holders
    • Oil pressure warning
    • One-touch down window Front and rear one-touch down windows
    • One-touch up window Front and rear one-touch up windows
    • Over the air updates
    • Passenger doors rear left Conventional left rear passenger door
    • Passenger doors rear right Conventional right rear passenger door
    • Proximity key Comfort Access with hands-free access and push button start
    • Rear cargo door Trunk
    • Rear cargo floor type Carpet rear cargo area floor
    • Rear cargo light Rear cargo area light
    • Rear cargo net
    • Rear cargo tie downs Rear cargo area tie downs
    • Rear reading lights
    • Rear seat direction Front facing rear seat
    • Rear window defroster
    • Rear windshield Fixed rear windshield
    • Rearview mirror Auto-dimming rear view mirror
    • Second-row windows Power second-row windows
    • Service interval warning BMW TeleServices service interval indicator
    • Smart device-as-key proximity door locks BMW Digital Key smart device-as-key proximity door locks
    • Speed sensitive wipers
    • Speedometer Redundant digital speedometer
    • Sport pedals Sport style pedals
    • Steering mounted audio control Steering wheel mounted audio controls
    • Tachometer
    • Tailgate control Tailgate/power door lock
    • Temperature display Exterior temperature display
    • Trip computer
    • Trip odometer
    • Valet key
    • Variable panel light Variable instrument panel light
    • Visor driver mirror Driver visor mirror
    • Visor illuminated driver mirror Illuminated driver visor mirror
    • Visor illuminated passenger mirror Illuminated passenger visor mirror
    • Visor passenger mirror Passenger visor mirror
    • Wipers Variable intermittent front windshield wipers
    • Wireless device charging Front wireless smart device charging
  • STANDARD

    • 16 Speakers
    • 4-Wheel Disc Brakes
    • ABS brakes
    • Adaptive suspension
    • Air Conditioning
    • Alloy wheels
    • AM/FM radio: SiriusXM
    • Apple CarPlay & Android Auto Compatibility
    • Auto High-beam Headlights
    • Auto-dimming door mirrors
    • Auto-dimming Rear-View mirror
    • Automatic temperature control
    • BMW Assist eCall
    • BMW Curved Display
    • BMW TeleServices
    • Brake assist
    • Bumpers: body-color
    • Connected Package Pro
    • ConnectedDrive Services
    • Delay-off headlights
    • Driver door bin
    • Driver vanity mirror
    • Dual front impact airbags
    • Dual front side impact airbags
    • Electronic Stability Control
    • Emergency communication system: BMW Assist eCall
    • Enhanced USB & Bluetooth Plus Smartphone Integration
    • Extended Merino Leather Upholstery
    • Exterior Parking Camera Rear
    • Four wheel independent suspension
    • Front anti-roll bar
    • Front Bucket Seats
    • Front Center Armrest
    • Front dual zone A/C
    • Front Ventilated Seats
    • Fully automatic headlights
    • Garage door transmitter
    • harman/kardon Speakers
    • harman/kardon Surround Sound System
    • Heated door mirrors
    • Heated Front Seats
    • Icon Adaptive LED Headlights w/Laserlight
    • Knee airbag
    • Leather Shift Knob
    • Low tire pressure warning
    • Lumbar Support
    • M Compound Brakes w/Red Calipers
    • M Sport Seats
    • Memory seat
    • Navigation System
    • Occupant sensing airbag
    • Outside temperature display
    • Overhead airbag
    • Panic alarm
    • Parking Assistant Plus
    • Passenger door bin
    • Passenger vanity mirror
    • Power door mirrors
    • Power driver seat
    • Power Front Seats
    • Power passenger seat
    • Power steering
    • Power windows
    • Radio data system
    • Radio: AM/FM Audio System
    • Rain sensing wipers
    • Rear air conditioning
    • Rear anti-roll bar
    • Remote keyless entry
    • SiriusXM Satellite Radio w/1 Year Subscription
    • Speed control
    • Speed-sensing steering
    • Speed-Sensitive Wipers
    • Split folding rear seat
    • Spoiler
    • Steering wheel mounted audio controls
    • Telescoping steering wheel
    • Tilt steering wheel
    • Traction control
    • Turn signal indicator mirrors
    • Variably intermittent wipers
    • Wheels: 19""x9.5"" Fr.&20""x10.5""Rr. M Bi-color (1T8)
    • Wireless Device Charging
  • SAFETY AND SECURITY

    • 3-point seatbelt Rear seat center 3-point seatbelt
    • ABS Brakes 4-wheel antilock (ABS) brakes
    • Adaptive headlights Directionally adaptive headlights
    • Auto headlights Auto on/off headlight control
    • Auto high-beam headlights High Beam Assistant auto high-beam headlights
    • Auto levelling headlights Auto-leveling headlights
    • Automatic brake hold
    • Automatic vehicle parking Parking Assistant Plus automatic vehicle parking
    • Blind spot Blind Spot Detection
    • Brake assist system
    • Brake type 4-wheel disc brakes
    • Camera Surround View w/3D View aerial view camera
    • Child door locks Manual rear child safety door locks
    • Configurable instrumentation gauges
    • Delay off headlights Delay-off headlights
    • Driver attention monitor Active Protection driver attention alert
    • DRL preference setting
    • Electronic stability control DSC electronic stability control system
    • Forward collision warning Frontal Collision Warning forward collision mitigation
    • Front camera Front mounted camera
    • Front impact airbag driver Driver front impact airbag
    • Front impact airbag passenger Passenger front impact airbag
    • Front side impact airbag driver Seat mounted side impact driver airbag
    • Front side impact airbag passenger Seat mounted side impact front passenger airbag
    • Gauge cluster display size (inches) Gauge cluster display size: 12.30
    • Headlight type Projector beam headlights
    • Headlights LED low and high beam headlights with laser supplement
    • Heated wipers Heated front windshield jets
    • High mount stop light High mounted center stop light
    • Hill start assist
    • Illuminated entry
    • Immobilizer
    • Instrumentation display BMW Curved Display digital/analog instrumentation display
    • Knee airbag Driver and passenger side knee airbag
    • Lane departure Lane Departure Warning
    • LED brake lights
    • Left camera Left side camera
    • Low tire pressure warning Tire specific low air pressure warning
    • Multiple headlights Multiple enclosed headlights
    • Number of airbags 8 airbags
    • Number of door entry light(s) 4 door entry light(s)
    • Occupancy sensor Airbag occupancy sensor
    • Overhead airbags Curtain first and second-row overhead airbags
    • Parking sensors Parking Assistant Plus front and rear parking sensors
    • Pedestrian detection City Collision Mitigation pedestrian impact prevention
    • Perimeter approach lighting Remote activated perimeter approach lighting
    • Post collision braking system Automatic post-collision braking system
    • Rain detecting wipers
    • Rear camera Rear mounted camera
    • Rear collision warning Rear Collision Prevention
    • Remote panic alarm
    • Right camera Right side camera
    • Running lights LED daytime running lights
    • Seatbelt pretensioners Front seatbelt pretensioners
    • Seatbelt pretensioners number 2 seatbelt pre-tensioners
    • Security system
    • Speed limit display Speed Limit Info speed limit display
    • Tire mobility kit
    • Turn signal in door mirrors Turn signal indicator in door mirrors
    • Vehicle tracker
  • POWERTRAIN AND MECHANICAL

    • ABS Brakes Four channel ABS brakes
    • Alternator Type Brake Energy Regeneration regenerative alternator
    • Battery run down protection
    • Battery type Lithium ion battery
    • Compressor TwinPower twin turbo
    • Cross drilled brakes Cross drilled/slotted front and rear disc brakes
    • Cylinder head material Aluminum cylinder head
    • Drive type Rear-wheel drive
    • Driver selectable steering effort M Drive driver selectable steering effort
    • Drivetrain selectable Driver selectable drivetrain mode
    • Electronic parking brake
    • Engine 3L I-6 direct injection, DOHC, Double VANOS variable valve control, TwinPower twin turbo, premium gasoline, engine with 503HP
    • Engine block material Aluminum engine block
    • Engine Configuration I6
    • Engine cooler Engine oil cooler
    • Engine Location Front mounted engine
    • Engine Mounting direction Longitudinal mounted engine
    • Engine Short 3L I-6 DOHC
    • Front anti-roll Front anti-roll bar
    • Fuel Type Premium gasoline
    • Ignition Spark ignition system
    • Limited slip differential M Sport Differential electro-mechanical limited slip differential
    • Lock-up transmission
    • Multi-mode exhaust
    • Overdrive transmission
    • Painted calipers Black painted front and rear brake calipers
    • Painted calipers Gold painted front and rear brake calipers
    • Painted calipers Red painted front and rear brake calipers
    • Powertrain type ICE
    • Radiator Heavy-duty radiator
    • Rear anti-roll Rear anti-roll bar
    • Rear Springs Regular grade rear springs
    • Selectable mode transmission M Drive selectable mode transmission
    • Sequential shift control M Steptronic Sequential shift with steering wheel controls
    • Shock absorbers Gas-pressurized shock absorbers
    • Speed sensitive steering M Servotronic speed sensitive power steering
    • Springs front Front coil springs
    • Springs rear Rear coil springs
    • Start-stop engine Auto stop-start engine
    • Steering Electric power-assist steering system
    • Steering type Rack-pinion steering
    • Suspension auto correcting Adaptive M Suspension adaptive ride suspension
    • Suspension control Driver controlled suspension ride settings
    • Suspension ride type front Independent front suspension
    • Suspension ride type rear Independent rear suspension
    • Suspension Sport ride suspension
    • Suspension type front Strut front suspension
    • Suspension type rear Multi-link rear suspension
    • Tailpipe Stainless steel dual exhaust with dark chrome tailpipe finisher
    • Traction control M Traction Control all-speed ABS and driveline traction control
    • Transmission 8-speed automatic
    • Transmission oil cooler
    • Transmission Type Automatic
    • Variable intake manifold
    • Ventilated brakes Front and rear ventilated disc brakes
  • COMFORT

    • Air conditioning Yes
    • Armrests front center Sliding front seat center armrest
    • Cabin air filter
    • Climate control Automatic climate control
    • Console insert material Aluminum console insert
    • Cooled front seats Ventilated driver and front passenger seats
    • Door panel insert Metal-look door panel insert
    • Door trim insert Leatherette door trim insert
    • Driver lumbar Driver seat with 4-way power lumbar
    • Driver seat direction Driver seat with 12-way directional controls
    • Dual-zone front climate control
    • Floor coverage Full floor coverage
    • Floor covering Full carpet floor covering
    • Floor mats Carpet front and rear floor mats
    • Folding rear seats 40-20-40 folding rear seats
    • Front head restraint control Manual front seat head restraint control
    • Front head restraints Height adjustable front seat head restraints
    • Front passenger lumbar Front passenger seat with 4-way power lumbar
    • Front seat type Sport front bucket seats
    • Front seat upholstery Merino leather front seat upholstery
    • Front seatback upholstery Plastic front seatback upholstery
    • Gearshifter material Leather and metal-look gear shifter material
    • Headliner coverage Full headliner coverage
    • Headliner material Cloth headliner material
    • Heated front seats Heated driver and front passenger seats
    • Interior accents Metal-look interior accents
    • Manual driver seat controls Driver seat manual cushion extension
    • Manual passenger seat controls Passenger seat manual cushion extension
    • Number of memory settings 2 memory settings
    • Panel insert Aluminum instrument panel insert
    • Passenger seat direction Front passenger seat with 12-way directional controls
    • Power driver seat controls Driver seat power reclining, seatback side bolster support, cushion tilt, fore/aft control and height adjustable control
    • Power passenger seat controls Passenger seat power reclining, seatback side bolster support, cushion tilt, fore/aft control and height adjustable control
    • Rear climate control Rear climate control with rear controls
    • Rear console climate control ducts
    • Rear head restraint control 3 rear seat head restraints
    • Rear head restraint control Manual rear seat head restraint control
    • Rear head restraints Height adjustable rear seat head restraints
    • Rear seat folding position Fold forward rear seatback
    • Rear seat upholstery Merino leather rear seat upholstery
    • Rear seatback upholstery Carpet rear seatback upholstery
    • Rear seats fixed or removable Fixed rear seats
    • Rear seats Rear bench seat
    • Rear under seat ducts Rear under seat climate control ducts
    • Residual heat recirculation
    • Seating capacity 5
    • Split front seats Bucket front seats
    • Sport steering wheel
    • Steering wheel material Leather steering wheel
    • Steering wheel telescopic Manual telescopic steering wheel
    • Steering wheel tilt Manual tilting steering wheel
    • Tinted windows Light tinted windows
  • IN-CAR ENTERTAINMENT

    • Amplifier 464W amplifier
    • Antenna Diversity antenna
    • Antenna Window grid audio antenna
    • Aux input jack Auxiliary input jack
    • Digital signal processor Harman/kardon digital signal processor
    • External memory External memory control
    • Number of first-row screens 2 total number of 1st row displays
    • Primary display size 14.9 inch primary display
    • Primary display touchscreen Primary monitor touchscreen
    • Radio AM/FM/digital/SiriusXMsatellite
    • RDS Radio data system (RDS)
    • Satellite trial 12 month satellite trial subscription
    • Seek scan
    • Speakers Harman/kardon speakers
    • Speakers number 16 speakers
    • Speed sensitive volume
    • Voice activated audio Voice activated audio controls
    • Wireless streaming Bluetooth wireless audio streaming
  • ORIGINAL WARRANTY

    • Basic warranty 48 month/50,000 miles
    • Corrosion perforation warranty 144 month/unlimited
    • Maintenance warranty 36 month/36,000 miles
    • Powertrain warranty 48 month/50,000 miles
    • Roadside warranty 48 month/unlimited
  • EXTERIOR AND APPEARANCE

    • Body accent Exterior badging
    • Body panels Galvanized steel/aluminum/composite body panels with side impact beams
    • Bumper rub strip rear Black rear bumper rub strip
    • Bumpers front Body-colored front bumper
    • Bumpers rear Body-colored rear bumper
    • Door handle material Body-colored door handles
    • Door mirror style Black door mirrors
    • Door mirror type Standard style side mirrors
    • Grille style Black grille
    • Number of doors 4 doors
    • Paint Metallic paint
    • Rocker panel extensions
    • Special paint Monotone paint
    • Spoiler Rear lip spoiler
    • Tires P275/35YR19 summer performance BSW front tires and P285/30YR20 summer performance BSW rear tires
    • Wheels 19 x 9.5-inch front and 20 x 10.5-inch rear machined w/painted accents forged aluminum wheels
    • Window Trim Black side window trim
    • Windshield trim Black windshield trim
  • TECHNOLOGY AND TELEMATICS

    • Emergency SOS Capable BMW Assist eCall vehicle integrated emergency SOS system
    • Handsfree Enhanced Bluetooth handsfree wireless device connectivity
    • Integrated navigation Integrated navigation system with voice activation
    • Internet access ConnectedDrive Services Professional selective service internet access
    • Real time traffic ARTTI real-time traffic
    • Smart device integration Apple CarPlay and Android Auto Compatibility smart device wireless mirroring
    • USB ports 3 USB ports
  • FUEL ECONOMY AND EMISSIONS

    • Emissions LEV3-ULEV70 emissions
    • Emissions tiers Tier 3 Bin 70 emissions
  • PACKAGES

    • Parking Assistance Package
  • TECHNOLOGY

    • Android Auto
    • Apple CarPlay
    • Backup Camera
    • Keyless Entry
    • Keyless Start
    • Navigation System
    • Parking Assist
    • Premium Sound System
    • USB Port
    • WIFI Hotspot
  • SAFETY

    • Automatic Emergency Braking
    • Blind Spot Monitor
    • Brake Assist
    • Lane Departure Warning
    • Rear Cross Traffic Alert
    • Stability Control
    • Traction Control
  • INTERIOR

    • Cooled Driver Seat
    • Cooled Passenger Seat
    • Dual Climate Control
    • Heated Seats
    • Leather Seats
    • Memory Seat
    • Power Driver Seat
    • Rear Air Conditioning Controls
  • EXTERIOR

    • HID Headlights
    • Rain Sensing Front Wipers
    • Rear Spoiler
  • PERFORMANCE

    • Limited Slip Center Differential
    • Turbocharged

Although every reasonable effort has been made to ensure the accuracy of the information contained on this site, absolute accuracy cannot be guaranteed. This site, and all information and materials appearing on it, are presented to the user "as is" without warranty of any kind, either express or implied. All vehicles are subject to prior sale. Advertised prices exclude government fees and taxes, any finance charges, a dealer document processing charge, a dealer electronic filing charge, and any applicable emission testing charges. See dealer for further details.